Professional Experience:
Company : Single Buoy Moorings Offshore (FPSO: Xikomba)
Client : Exxon Mobil, Angola Atlantic Ocean
Designation & Period : Production Technician
, Since July 2006.
Nature of
work:
Oil separation and stabilization, Gas Treatment and Compression, Produced water
treatment, Sea water Treatment for water injection. Sub Sea
Well operation, Turret operation and Permit to Work (PTW).
Job Profile:
Ø
Start
up/shutdown and operation of Oil separation facilities and metering, Gas compressor, Glycol Dehydration, Produced water systems. Understanding safe
limit of operation.
Ø
Start
up/shutdown and operation of water Injection systems. Coarse/fine filtration,
De-aeration. Cooling/Heating media system.
Ø
Understanding
of all company procedures applicable to job. Isolations, Permit to work,
Operational, Fire and Gas.
Ø
Knowledge
of emergency response actions and duties as required in abnormal/emergency
situation.
Ø
Knowledge
and understanding of actions required to minimize safety or commercial loss.
Ø
Preparation/isolation
of plant for intrusive maintenance.
Ø
Turret
operations including Sub
Sea well line and
chemical injection packages .CAMERON Sub Sea Hydraulic Power Unit
Ø
Familiar
with Moore DCS & Allen-Bradley PLC control systems. Fire and Gas systems.
ESD systems.
Ø
Log
taking and understanding and interpretation of data.
Ø
Fully
aware of operation/control of online PCV’s, LCV’s , FCV’s , TCV’s on 3 phase bulk separators,
Free knock out vessel , ElectrostaticTreater.
Ø
Start
up/ shutdown of Sea Water lift pumps, Booster Pumps, Vacuum Pumps, Crude oil
transfer pump & Chemical injection pumps and Glycol circulating pump.
Ø
Fully
aware of isolation/Depress ring/Draining of vessels, heaters, tanks or other
oil field equipment’s with complete permit to work (PTW) procedure and
naturally occurring radioactive (LSA) scale precaution.
Ø Operation and optimization
of daily requirements for chemical dosing associated with the process system.
Ø Operation knowledge of
Methanol/LDHI/Asphatlen injection pumps used for initial start up of well.
Ø Start up/ shutdown of three
stage Gas Injection Compressor, Flash Gas Compressor, Turbine Driven Water
Injection Pumps and Turbine Driven Power Generators from Local Equipment Room
(LER).
Ø Knowledge of Master
controller, Load Sharing Controller and Anti surge control system used for
controlling three stage Gas Injection Compressors.
Ø Pigging Operations.
Ø Flare System vents and
drains. HP/LP fuel gas system, Nitrogen Generating Unit, Instrument Gas
Receiver and different type of Heat Exchangers.